Requirements
Prepare and review installation methods, procedures, and method statements for fixed jacket launching and integrated topside floatover operations.
• Define operational sequences and engineering constraints for load-out, sea-fastening, transportation, launching, floatover, and mating.
• Coordinate with analysis, naval architecture, and structural teams on installation calculations, ballasting requirements, and sea-fastening design.
• Review contractor and vendor deliverables, resolve technical comments, and coordinate responses to the client and Marine Warranty Surveyor.
• Identify marine operational risks and participate in HAZID workshops, risk assessments, and installation readiness reviews.
• Support offshore campaign planning, marine spread readiness, and technical follow-up during installation execution.
Qualifications
• Bachelor’s degree in Naval Architecture, Offshore, Mechanical, or Civil Engineering.
• Must have 8yrs+ experience as an Offshore Methods or Installation Engineer** with an EPCI or offshore installation contractor.
• Proven hands-on experience in fixed jacket launching and topside floatover installation operations.
• Strong knowledge of marine installation engineering, including load-out, transportation, sea-fastening, ballasting, and mating.
• Familiarity with MOSES, SACS, or OrcaFlex and marine operations standards such as DNV-ST-N001 is preferred.
• Fluent written and spoken English, with availability to work from the contractor’s regional office in Doha, Qatar.