Job Description: Scheduler – Construction Supervision
Project: Mixed-Use Residential Villas Development, Riyadh, Saudi Arabia
Position Type: Full-Time, Project-Specific (Site/Office Based)
Reports To: Planning Manager
Role Summary
We are seeking a highly organized and analytical Scheduler to join our construction supervision team for a mixed-use residential villas development in Riyadh. The successful candidate will be responsible for developing, maintaining, and monitoring the project schedule, ensuring that all construction activities—from site preparation through villa fit-out and infrastructure works—are tracked against baseline timelines. This role is critical in identifying schedule risks, analyzing contractor progress, and providing accurate forecasting to support timely project delivery.
Key Responsibilities
Schedule Development & Maintenance
- Baseline Schedule: Develop and maintain a detailed, resource-loaded baseline schedule using Primavera P6 (or MS Project) covering all project phases, including enabling works, substructure, superstructure, villa construction, MEP installation, landscaping, and handover.
- Schedule Updates: Update the master schedule monthly based on actual progress, incorporating approved change orders, revised sequences, and updated durations.
- Work Breakdown Structure: Establish and maintain a clear WBS aligned with the project’s scope, contract packages, and villa typologies (e.g., Type A, B, C villas, retail components, community facilities).
Progress Monitoring & Reporting
- Progress Measurement: Track contractor progress against the baseline using earned value metrics, S-curves, and critical path analysis. Verify progress claims against site reality.
- Reporting: Prepare weekly and monthly progress reports, including look-ahead schedules (3-week and 90-day), critical path status, float analysis, and variance reports for the Resident Engineer and Client.
- Dashboard & KPIs: Develop and maintain schedule dashboards highlighting key performance indicators such as schedule variance, productivity rates, and milestone achievement.
Risk Analysis & Mitigation
- Delay Analysis: Identify schedule risks, analyze delays (time impact analysis), and recommend mitigation measures to the supervision team and contractor.
- Critical Path Management: Monitor the critical path continuously and flag activities at risk of slippage. Propose recovery plans and acceleration measures where required.
- Interface Coordination: Coordinate schedule interfaces between multiple contractors (civil, MEP, landscaping, infrastructure) and identify sequencing conflicts.
Coordination & Communication
- Contractor Coordination: Review contractor-submitted schedules for compliance with contract requirements and logic. Chair or participate in schedule review meetings.
- Stakeholder Communication: Liaise with the Client, design consultants, and contractors to ensure schedule alignment and timely resolution of scheduling issues.
- Documentation: Maintain accurate records of schedule revisions, correspondence, and approved baseline changes.
Contract & Claims Support
- Extension of Time (EOT): Assist in the review and assessment of contractor EOT claims by providing schedule analysis and forensic delay documentation.
- Payment Certification: Support the commercial team by verifying progress percentages against the schedule for interim payment certificates.
Qualifications & Experience
- Education: Bachelor's degree in Civil Engineering, Construction Management, or a related discipline. A diploma in Project Planning/Scheduling is advantageous.
- Experience: Minimum of 9–12 years of experience in construction scheduling, with at least 2–3 years on residential/villa or mixed-use projects in the Gulf region. Experience in a consultant/supervision role (not just contractor-side) is strongly preferred.
- Software Proficiency: Expert-level proficiency in Primavera P6 is mandatory. Proficiency in MS Project, Excel (advanced), and familiarity with Power BI or similar reporting tools is highly desirable.
- Technical Knowledge: Strong understanding of construction sequencing for villas and mixed-use developments, including civil, structural, MEP, and finishing works. Knowledge of earned value management (EVM) principles.
- Regulatory Knowledge: Familiarity with Saudi Building Code (SBC) requirements and local authority approval processes (e.g., Riyadh Municipality, MODON) as they affect project timelines.
- Registration: Valid registration with the Saudi Council of Engineers (SCE) is mandatory.
- Language: Fluency in English (written and spoken) is essential. Proficiency in Arabic is highly desirable.